So far, every intrepid adventurer on the wine-dark sea of challenges to subsidy decisions under section 70 of the Subsidy Control Act 2022 (“SCA”) has fallen victim to one of the monsters, minor deities or barbarian tribes that lie in wait. The CAT’s decision in Zenobē adds to the list of shipwrecks on the route.
Getting the timing wrong
In Zenobē’s case, the ship failed to navigate between the Charybdis of challenging too late and the Scylla of challenging too early.
The Charybdis of challenging too late is the more obvious hazard. By rule 98A of the CAT Rules, a challenge is out of time if made more than one month after the subsidy is placed on the register or more than one month after an answer to a section 76 request made within one month of registration: and where the subsidy or putative subsidy is not placed on the register, within one month of the applicant first becoming aware of the decision – New Lottery Co Ltd v Gambling Commission [2026] CAT 14. Once into that whirlpool, a late application is very unlikely indeed to escape, at least without help from a passing friendly deity: the “exceptional circumstances” provision in rule 98A(7) is confined to the truly extraordinary (see Aramark v CMA [2026] CAT 18).
But the Scylla of applying too early is also a very real, though not so obvious danger: and in Zenobē, it was she who caught the applicant.
Zenobē concerns the development of a scheme to encourage installations of long duration energy storage solutions (LDES). In September 2025 GEMA published its intended approach, outlining a “cap and floor” scheme. Applications were invited at that stage, on the basis that decisions would be made on them after the enactment of section 10P of the Electricity Act 1989, which requires GEMA to establish and operate an LDES scheme (the relevant Bill being at that stage still before Parliament). In February, after section 10P had come into force, Ofgem decided to adopt the scheme set out in September under that section. The applicant challenged both those decisions in separate applications, which were then consolidated.
The CAT held that the September documents did not amount to a decision to give a subsidy or make a subsidy scheme. Essentially, that was because, even though applications were invited at that stage, the scheme had not been finalised in various essential respects and no decision on the applications would be made until section 10P had come into force – and, indeed, it was anticipated that the design of the scheme would be affected by the extent and nature of the applications made. In short, the CAT concluded that “the publication of the September documents was … simply a step in the development of the Scheme, not the making of the Scheme itself” [78].
Further, even the February decision was not a subsidy decision: according to the CAT, all that happened in February was that Ofgem decided to adopt the September decision for the purposes of section 10P (which by that stage was in force). As the CAT said at [80], “It remained the position that the work being undertaken at that time was preparatory or development work that was being done with a view to the future establishment of the Scheme by Ofgem pursuant to s.10P when that provision had come into force.”
Section 78(2): “made by means of primary legislation”
But even if Zenobē had succeeded is passing unscathed through the narrow straights of timing, the CAT made it clear that the voyage would nonetheless have ended in disaster. The CAT agreed with GEMA that the effect of section 10P, in subsidy control terms, was that the general exemption for the requirements of the SCA in section 78(2) applied. That exemption applies to schemes “for the provision of financial assistance made by means of primary legislation”, except so far as provided by Schedule 3 to the SCA.
Zenobē attempted to defeat that objection by arguing that section 10P, though it required a scheme to be made, did not require any particular scheme to be made, so that a scheme made under it left “choice and discretion” to the decision-maker and so could not be said to have been made by means of primary legislation. But the CAT rejected that argument, holding that although paragraph 4 of Schedule 3 confines the scope of the section 78 exemption to cases where the authority is under a duty to make a scheme as opposed to a mere power to make one, the statutory language nonetheless clearly envisaged schemes made by an authority under a legislative duty, and could not be confined to the case where the scheme was itself contained in legislation. Moreover, if the SCA duties applied to a scheme that was required to be made by a public authority, the public authority would be unable to comply with its duty to make the scheme if it could not do so in a way that in its view complied with the subsidy control principles, thereby making its statutory duty to make the scheme dependent on its own assessment of the subsidy control principles. The CAT felt that such a result would not be consistent with parliamentary sovereignty: [89].
However, that approach is, in my view, inconsistent with the United Kingdom’s obligations under the Trade and Cooperation Agreement (TCA). In general, Article 372(1) TCA requires that any decision by a granting authority to give a subsidy must be challengeable before a court or tribunal. There is an exception in Article 372(4) which, in relation to the United Kingdom, provides that Article 372(1) does not require it “to widen the scope or grounds of review by its courts and tribunals of Acts of the United Kingdom Parliament … beyond those existing under its law on the date of entry into force of this Agreement”. However, the effect of Zenobē is to immunise from judicial challenge in the CAT not Acts of the UK Parliament as such but, rather, the choices made by public authorities in deciding how to comply with their duties under Acts of the UK Parliament: and there is no plausible basis for asserting that such decisions were, before the TCA, not subject to judicial review.
It is important here to recall that, even where an Act of the UK Parliament requires a public authority to design a subsidy scheme, the application of the Schedule 1 or 2 principles (for example, principles E and F – minimisation of distortive effects and effects competition and investment within the United Kingdom) to that scheme will be very sensitive to the design choices that are made. The effect of the CAT’s analysis in Zenobē is that the approach of public authorities to such questions when designing a particular scheme is immune to judicial review, as long as the authority is acting under a duty imposed by an Act of the UK Parliament to make a scheme. Indeed, even more strikingly, it would appear that the public authority is under no obligation, in such a case, to consider the application of the Schedule 1 or 2 principles at all, since Schedule 3 imposes no such duty in relation to subsidies made by means of primary UK legislation. (Schedule 3 does apply the SCA to Acts of the Scottish Parliament, Senedd, and Northern Ireland Assembly and so raises different issues not considered here.)
The effect of Zenobē is, therefore, to create an area of subsidy decision-making, going wider than the immunity from judicial scrutiny enjoyed by Acts of the UK Parliament, that appears to escape both the section 12 and 13 duties and any judicial scrutiny at all. That is not obviously consistent either with the rule of law or with UK obligations under the TCA.
As for the arguments of the CAT in support of its construction, those arguments ignore what in my view is the true construction of section 78(2) and Schedule 3, namely that the exemption applies only to the extent that the statutory provisions at issue require the granting authority to design the scheme in a particular way, but does not apply to the extent that a design choice is one that need not have been made in order to comply with the duty. Such a construction may, of course, give rise to argument as to the extent to which a particular design choice need or need not have been made in order to comply with the statutory duty: but it narrows the scope of the section 78 exception to decisions which really are Parliament’s and preserves the application of the section 12 and 13 duties, and the possibility of judicial review, in cases where the authority is making its own choices within the scope of the requirements laid down by Parliament.
In my view, therefore, the CAT’s analysis of section 78 and Schedule 3 is unconvincing, and notably fails to engage with the provisions of the TCA. As its holding is plainly obiter, given its findings on timing, it is of limited precedential effect, and I would respectfully suggest that it should not be followed in future cases.
CAT challenges on non-SCA grounds
Zenobē did succeed on one point of considerable importance. Zenobē’s grounds of challenge included a complaint, quite independent of compliance with the SCA, that the authority was acting outside the scope of its powers. GEMA sought to argue that that ground was precluded from review in the CAT as it was not based on non-compliance with any provision of the SCA. The CAT, at [107]-[108], rejected that objection. In my view, that was plainly right: section 70 confines the grounds of review to non-compliance with the SCA: the jurisdictional limitation is framed by reference to the kind of decision at issue (it must be a subsidy decision) rather than by reference to the possible grounds of review. Moreover, as the CAT noted, a limitation on the grounds of review would lead to unnecessary duplication, as an applicant who sought to bring challenges on both SCA and non-SCA grounds (which might well overlap) would have to bring judicial review proceedings in the High Court or Court of Session as well as in the CAT.
Conclusion
The CAT’s conclusion on non-SCA grounds of review will be of some assistance to applicants. However, its conclusion on section 78 will, unless departed from or overruled in a future case, seriously limit the possibility of challenge in a number of important cases, and in my view is incompatible with the requirements of the TCA. Further, its reasoning on timing highlights the significant problem in many cases of working out exactly when to mount a challenge: a problem that in many cases amounts to a further disincentive to pursue section 70 challenges. It remains to be seen if a traveller ever makes it home.