Management of Port Infrastructure through a very long Concession Contract: Is the Funding Gap Method Meaningful?

port
Competitive selection of the operator of an infrastructural facility normally eliminates State aid. However, modifications to the contract after the operator is selected may confer an advantage that constitutes State aid. Public funding that is calculated on the basis of the “funding gap” method ensures that the aid is necessary and proportional.

Introduction
 
Several recent articles in the blog have examined State aid to infrastructural projects such as ports, airports, stadiums and arenas. Although the analysis of the existence and compatibility of aid follows in all cases the same logic and is based on the same principles, each project has its own peculiarities. Sometimes, these peculiarities are so complex or unusual that it is difficult to understand their treatment by the Commission.In this article I review a Commission decision concerning a Sicilian port. The construction for the modernisation of the port and its subsequent management and operation were awarded to a concession holder for a long period. The concessionaire was selected on the basis of an open and non-discriminatory tender. After the award of the contract, the concession was extended for an even longer period. Yet, the calculations of investment costs and projected revenues were based on a much shorter period.


Do you know we also publish a journal on State aid?

EStAL banner
The European State Aid Law Quarterly is available online and in print, and our subscribers benefit from a reduced price for our events.


 

The investment project

Commission Decision SA.36621[1] concerns a notification of investment aid to the Port of Capo D’Orlando in Sicily which is an area that qualifies for assistance under Article 107(3)(a) TFEU.

The objective of the investment is to upgrade and develop the port infrastructure and expand its facilities. The project is expected to create about 60 direct jobs and 400 indirect jobs.

The total cost of the project is EUR 48.3 million.[2] The public contribution of EUR 20 million is made up of a grant from the EU [ERDF] of EUR 12.5 million and a grant from the Sicilian region of EUR 7.3 million. The remaining EUR 28.5 million will be made available by the concessionaire who is already chosen via tender.
The project is divided in two parts: i) transport infrastructure costing EUR 28.5 million and ii) tourist infrastructure costing 19.8 million. For the transport infrastructure, the Italian authorities intend to grant aid amounting to EUR 13.86 million which corresponds to aid intensity of 49% [= 13.86/28.5]. For the tourist infrastructure, public assistance is intended to be in the form of regional aid amounting to EUR 5.94 million which corresponds to aid intensity of 30% [= 5.94/19.8].

Analysis based on the funding gap method indicates that the part of the investment related to the transport infrastructure has a negative NPV of EUR 13.18 million over a reference period of 25 years. The funding gap ratio, calculated as the ratio between the NPV and the discounted total cost of the project (EUR 26.38 million), amounts to 50%.

The owner of the land and the infrastructure is the Italian state. The concessionaire who will build and operate the port has been chosen on the basis of an open and non-discriminatory tender. The initial expected total cost of the investment was EUR 23.1 million, the duration of the concession contract was 40 years, and the contribution of the concessionaire to the investment costs was EUR 15.7 million, with an internal rate of return [IRR] of 11.4%.

Because, according to the Decision, unforeseen legal and regulatory changes raised investment costs by EUR 25.2 to EUR 48.3 million, the concession contract was extended to 60 years. The new IRR has dropped to 7.6% which is only slightly above the Weighted Average Cost of Capital [WACC] of the concessionaire.

Existence of State aid

The normal practice of the Commission is to examine whether State aid exists at three levels: owner, operator, users. Since the concessionaire will operate the port for 60 years, the Sicilian authorities which are the owners are not considered by the Commission to derive any advantage. The users are also not considered to derive an advantage because they will pay market fees. At any rate, the market fees will ensure that any advantage to the users is limited.

In relation to the operator, the position of the Commission is rather surprising. It correctly concludes that the tendering process cannot guarantee the absence of advantage because the concession contract was modified after it was awarded. However, it is silent on whether the modification is in compliance with EU public procurement rules. This is surprising because State aid that violates any other provisions of EU law cannot be declared to be compatible with the internal market.

Compatibility

The regional aid for the tourist infrastructure is compatible with the internal market because it contributes to job creation and the aid intensity is below the maximum allowable ceiling for that area which is 30%.

The aid for the transport infrastructure is assessed according to the common principle of compatibility and it too is found to be compatible with the internal market. The analysis is fairly standard and follows the lines of other similar decisions over the past couple of years, except the part that refers to the necessity and proportionality of the aid.

In relation to the necessity of aid, the Commission explains that “the part of the project which refers to transport activities has a funding gap/negative NPV of EUR 13.18 million over a reference period of 25 years, which shows that the net revenues to be derived over a period of 25 years do not remunerate the investment costs. The formula for the calculation of the funding gap takes into account the residual value of the infrastructure at the end of its economic life (considered to be 25 years), which is added to the operating revenues. Given the results of the funding gap analysis provided by the Italian authorities, it must be concluded that this part of the investment could not have been undertaken by a private investor without public support” [paragraph 55].

The problem with this statement is that the funding gap analysis concerns a period of 25 years while the concession is for the duration of 60 years. This hardly makes sense.

Indeed the Commission is aware of this problem because in the very next paragraph it tries to justify its views as follows. “In the present case, moreover the duration of the concession is more than two times the economic life of the project on which the funding gap analysis is based. It could be argued therefore that revenues that the concessionaire is supposed to obtain after 25 years could put into question the necessity for the aid. However, the Commission believes that due to the high degree of uncertainty surrounding any financial forecast over such a long period of time, it is very unlikely that any private investor would have accepted to make an investment whose profitability prospects can be realised only several years after the estimated economic life of the infrastructure.”

This statement is correct. But it does not solve the problem of why the Italian authorities grant State aid which ensures that the project is profitable in the first 25-year period and then on top of that make the port freely and exclusively available to the concessionaire for an additional period of 35 years!

Moreover, the Commission fails to consider whether the concession contract created a liability for the Sicilian authorities in case of regulatory change. The concessionaire had already been chosen and presumably it was committed to the project. Did it also assume all the risks concerning changes in the regulations concerning port operations or were the Sicilian authorities obliged to indemnify it in case of regulatory changes? On this point, the Commission Decision is silent, but it is an important issue that can determine the presence or absence of incentive effect.

In relation to the proportionality of the aid, the Commission notes that the public funding of the project accounts for 49% of the investment costs while the funding gap ratio identified for the project is 50%. It concludes that it is in line with the practice of the Commission. [paragraphs 58-59]

In fact this case reveals that the funding gap has little to do with the proportionality of the aid. Earlier in its Decision, the Commission notes that the IRR after the increase in investment costs dropped from 11.4% to 7.6% which was “only slightly above the WACC” [paragraph 13]. The IRR and WACC are the relevant figures for determining the proportionality of the aid. Aid is proportional when it makes the project acceptable to the investor. Whether the project is acceptable depends on the investor’s cost of capital. Therefore, the proportionality of the aid can be judged only by comparing the return generated by the project to the cost of the capital needed for the project.

Lastly, the statement that the modified IRR was even “slightly above” the concessionaire’s WACC implies that the extension of the concession to 60 years was a gift to the concessionaire.

Conclusions

This is a Decision with gaps in reasoning and explanation. It confirms the use of the funding gap method for determining the necessity and proportionality of State aid for infrastructural projects. However, it does not explain why modifications to the concession contract after it was awarded had no impact on the compatibility of the aid.


[1] The full text of the Commission Decision can be accessed at:

http://ec.europa.eu/competition/state_aid/cases/248535/248535_1511225_165_2.pdf

[2] The figures in this article are adjusted downwards to take account of EUR 0.22 million intended for works that fall within the formal remit of the state carrying out its official duties. These works are not economic in nature and their public funding does not constitute State aid. See paragraphs 36-39 of the Decision.

Tags

About

Phedon Nicolaides

Dr. Nicolaides was educated in the United States, the Netherlands and the United Kingdom. He has a PhD in Economics and a PhD in Law. He is professor at the University of Maastricht and the University of Nicosia. He has published extensively on European integration, competition policy and State aid. He is also on the editorial boards of several journals. Dr. Nicolaides has organised seminars and workshops in many different Member States, and has acted as consultant to several public authorities.

Related Posts

27. Feb 2024
State Aid Uncovered by Phedon Nicolaides
A Large Regional Investment Project in Spain - State Aid Uncovered photos 6

A Large Regional Investment Project in Spain

Introduction Most State aid to “large” investment projects is granted by the Member States in Central and Eastern Europe. Moreover, most of the aid goes to induce companies to locate their projects in those countries and to overcome regional handicaps that make the investments less profitable or even loss-making than in other locations. By contrast, regional aid granted to large […]
25. Jan 2022
State Aid Uncovered by Phedon Nicolaides
Duplication of Infrastructure Does not Promote Regional Development - Social Media posts 6

Duplication of Infrastructure Does not Promote Regional Development

A private investor is not interested in regional development. A private investor recoups its investment in infrastructure from revenue from the operation of that infrastructure. Duplication of infrastructure does not contribute to regional development. Introduction In 2015 the European Commission caused a buzz in the State aid community when it decided that investment aid granted to a small Polish airport […]
04. Jan 2022
State Aid Uncovered by Phedon Nicolaides
Public Funding of an Energy Infrastructure Project - Social Media posts 2

Public Funding of an Energy Infrastructure Project

State aid up to 100% of the funding gap of a project can be compatible with the internal market. Introduction The European Commission approved investment aid for a Liquefied Natural Gas [LNG] terminal in Alexandroupolis in northern Greece [case SA.55526]. The project involves the following: A Floating Storage Regasification Unit [FSRU] for the storage and regasification of LNG. The construction […]
30. Nov 2021
State Aid Uncovered by Phedon Nicolaides
Public Funding of an Undertaking in a Closed Sector - Blog Visual 48

Public Funding of an Undertaking in a Closed Sector

Public funding of undertakings in sectors closed to competition does not constitute State aid. A sector is closed to competition when competition on and for the market is precluded by law. Introduction Determining when State aid does not affected cross-border trade is both difficult and tricky. But there is one exception; when the sector is closed to competition. A sector […]
13. Apr 2021
State Aid Uncovered by Phedon Nicolaides
State Guarantee to an Energy Project - StateAidHub blogpost15 gas

State Guarantee to an Energy Project

A state guarantee can bridge the funding gap of an infrastructure project. Introduction State aid rules allow energy infrastructure projects to be supported by as much aid as is necessary to bridge their “funding gap”; i.e. the difference between the initial investment cost and the present value of their expected net operating revenue which is the future gross revenue minus […]
26. May 2020
State Aid Uncovered by Phedon Nicolaides
State Aid for i) Water Development ii) Travel - StateAidHub blogpost21 water development travel

State Aid for i) Water Development ii) Travel

Aid to individuals in the context of social policy is compatible with the internal market as long as it is granted without discrimination on the origin of products or services. Temporary Framework: Number of approved covid-19 measures, as of 22 May 2020: 129* Legal basis: Article 107(2)(b): 9; Article 107(3)(b): 111; Article 107(3)(c): 12 * Excludes amendments to previously notified […]
03. Mar 2020
State Aid Uncovered by Phedon Nicolaides
State Aide_Infrastructure

Public Funding of Infrastructure without State Aid

The existence of State aid must be checked at the level of both the direct and indirect beneficiaries who are the owners and users of infrastructure, respectively. If payments to private land owners are to be free of State aid, they must be calculated on the basis of an objective formula that takes into account the size and value of […]
06. Aug 2019
State Aid Uncovered by Phedon Nicolaides
Transport: Airlines and Bus Operators - StateAidHub blogpost31 Stateaid transport

Transport: Airlines and Bus Operators

For investment aid to the operator of an airport to be considered as indirect aid to airlines, there must be an inseparable link between the aid and beneficiary airlines. For a competitor to claim that it is harmed by State aid, it must prove that its position in the relevant market is substantially affected. Ensuring that the costs of public […]
03. Apr 2019
State Aid Uncovered by Phedon Nicolaides
The Incentive Effect of Public Funding of Infrastructure in Tranches - StateAidHub blogpost13 StateAid motorway greece E65 EU Comission lexxion

The Incentive Effect of Public Funding of Infrastructure in Tranches

Public funding of functionally and commercially severable parts of an infrastructure project may have incentive effect even after construction is completed on some of the parts. A subsidy for the operation of a toll motorway may not constitute State aid.   Introduction State aid granted to a project that has already started lacks incentive effects and, therefore, cannot be found […]
21. Dec 2018
State Aid Uncovered by Phedon Nicolaides
Infrastructure Projects, State Guarantees and Distortion of Competition - SAH blogpost51 52 stateaid infrastructure guarantees

Infrastructure Projects, State Guarantees and Distortion of Competition

State guarantees must be limited in duration and amount and the conditions for their mobilization must be defined in advance. Public funding to an operator in a closed sector does not affect trade and, therefore, does not constitute State aid.   Introduction Large infrastructure projects are complex, encounter many unforeseen problems and often fall behind schedule for years. Consider, for […]